We are committed to delivering solutions to happy clients that truly make a difference for our planet.
Case Studies
Peel Ports Starts G100 & G99 Journey
Peel Ports, a significant maritime hub located in Liverpool, was contending with a series of challenges, primarily centered around Compliance & Regulation. The data indicates that issues related to Market Interface and Flexibility were also contributing to their high-level operational problems, suggesting a need for more integrated and adaptable solutions within their energy infrastructure
JMarr G100 Export Limitation for CHP
J Marr (Seafoods), a prominent player in the seafood industry, was grappling with the challenge of escalating energy costs. This directly impacted their operational expenses and overall profitability. Furthermore, the company faced significant exposure to the volatility of energy prices, which made effective budgeting and long-term financial planning difficult.
HMP Milsike solves low carbon connection issues with Argand G100 Solution
The HMP Millsike project in Yorkshire saw the deployment of 608 kW of solar PV capacity distributed across six separate locations within the prison estate, commissioned for client Kier. A principal challenge was maintaining stringent compliance with regulatory standards whilst solving the complexity stemming from the dispersed solar PV units requiring intricate HV monitoring and a fiber optic network for real-time power level compliance, all while adhering to strict cybersecurity and access protocols.
Keele University Enables Micro Grid with Argand G100 Solution
Keele University, a large educational establishment based north of Birmingham, has developed a Micro Grid for their campus (called SEND) that they are using to better balance the generation of wind & solar with their demand via energy storage. Installing wind, solar & energy storage meant that they needed to implement a G100 solution as the total generation / storage power were greater than their allowable export limit.
G99 Solar plus SWANS ANM Scheme
The "Netley Solar G99 & SWANS" project, located in Hampshire, involves a 2,400 kWac Solar PV asset for Fuse Energy. It addresses key client challenges such as compliance and market interface requirements by implementing our Power Plant Controller and G100 Export Limitation solutions. As such, the project utilises Argand's GridGEM and GridLENZ products, offering client benefits including project connection enablement, real-time data access, and regulatory compliance.
GridGEM Enables Vensys Wind Turbines to Connect to UK Grid
Peel Ports, a significant maritime hub located in Liverpool, was contending with a series of challenges, primarily centered around Compliance & Regulation. The data indicates that issues related to Market Interface and Flexibility were also contributing to their high-level operational problems, suggesting a need for more integrated and adaptable solutions within their energy infrastructure
Ethical Power Type C G99 Control & EMS Interface
GridGEM was chosen by Ethical Power to provide the G99 interface for active control plus the provision of a G99 fault and power quality recorder. The system is one of only 2 that are approved in the UK market and will enable any type C or larger installation meet the existing DNO G99 requirements for real-time data recording.
GridGEM Enables Multi-Roof Solar with HV Connection Constraints
GridGEM was chosen by Solar Sense UK to provide the solution to enable a complex solar installation to take place on an industrial client site with inverters in multiple locations, multiple HV incomers and large distances physically between assets.
Marjon University Complex G100 Solar PV Project
GridGEM was chosen by Plymouth Marjon University and their key energy contractor, Mole Energy, to provide a G100 compliant solution to manage their export constraint at their site. The project was deemed to be complex due to the distances involved and the client’s HV connected site which required significant design engineering. The system manages 2 different installations to ensure that export remains within the DNO’s required limit.
PEC Automated HTMl Reporting Case Study
Plymouth Energy Community, a community energy organisation based in south west UK, has over 30 sites where they are providing power purchase agreements (PPA) for solar energy installed on the roofs of schools & community buildings.
GridGEM Enables “Parallel Supply” Private Wire Connection with ANM & G100
GridGEM was chosen by Black Dog Biogas to provide the solution to the complex set of problems associated with connecting their biogas electricity generating units to the Vestas wind turbine manufacturing site in the Isle of Wight in the UK.
The project had issues of parallel supply, active network management (ANM) & export limitation (G100 in the UK.)
GridGEM Enables G100 Export Constrained Rooftop Solar with Multiple HV Incomers
GridGEM was chosen by Sungift Energy as their chosen solution to enable the connection of their 240 kWp solar PV system at BREAN Leisure Park. GridGEM was chosen because it made the complex connection problem simple to overcome.
GridGEM chosen as Solution to Manage Constrained Wind Turbine Incorporating Load Management
GridGEM was chosen by a Scottish client to provide an export limitation solution that embedded load management prior to reducing the output of the turbine.
Active Network Management Solution for 2.5MW Wind Turbine
GridGEM was chosen by Clean Earth Energy to provide the realtime and dynamic client side ANM interface between their 2.5 MW Vensys wind turbine and Scottish Power, the DNO.
GridGEM Chosen as Solution to Manage 850 kW Wind Turbine Private Wire
Royal Mint, the UK-based provider of currency, needed a trusted solution to manage the provision of electricity from an 850 kW wind turbine on a private wire to their site which was subject to an export constraint
GridGEM enables Zero Export Limit on Solar PV Project to Go Ahead at DPD
DPD require zero export limitation solution – Argand Solutions worked closely with a renewable energy EPC provider to supply DPD (www.dpd.co.uk) with an integrated 450kWp solar PV zero export limitation solution at their head office in Hinckley Birmingham to help reduce costs at their large distribution centre.
GridGEM Enables Multi-MW Solar Co-Location with Wind Farm
GridGEM was chosen as the control solution to enable the co-location of 2.5MW of solar PV with an existing 6MW wind farm to ensure that the combined power did not break the existing 6MW connection & export limit.
GridGEM Enables Investor Owned Wind Turbine to Connect to Industrial Site via Private Wire
GridGEM was chosen as the control solution to enable a 500kW wind turbine to supply electricity to Imerys’s clay mining site via a private wire in Cornwall. The project was complex due to a combination of export constraints across multiple HV connection points & the need for a dynamic changeover between different connection points.
GridGEM Enables Southend Airport to Install 2.5MW of Solar PV
GridGEM was chosen by Syzygy Renewables as the control solution to enable a 2.5MW solar PV system to be installed at Southend Airport. The project was complex due to a combination of export constraints across multiple HV connection points & the need to solve the problem of communicating with the inverters across a runway!
Automated Energy Analytics for Food Manufacturer
Blue Sea Foods, a Devon-based sea food manufacturing business, engaged Argand Solutions to utilise GridLENZ to enable automated HTML / web reporting & analytics for their food manufacturing business
UK – 6MWp Solar PV Site Monitoring Solution
Prior to engaging Argand Solutions, the client, Bee Green Solar, had previously installed a 6MWp ground mount solar PV site in south west England. The site had been installed without suitable monitoring & / or performance analytics and, as such, there was no visibility on weather-adjusted returns and / or real-time O&M issues. The client engaged Argand to solve this problem.
GridGEM Enables Wind Turbine to be installed with Export Limit
Client enables wind turbine on constrained Grid – Argand Solutions provided the client with a GridGEM™ export limitation solution that managed the output of a Northern Power 100kW wind turbine to enable the client to connect
GridGEM Enables Solar PV at Burgh Island Hotel
Burgh Island Hotel Solar PV Enabling Solution – Argand Solutions worked closely with renewable energy provider SunGift Solar to provide Burgh Island Hotel, with a 50kWp solar PV system that they would otherwise not have been allowed.
BREEAM Excellent for Energy Monitoring at Avanta
Avanta, a serviced office business now owned by Regus, achieved BREEAM excellent through their introduction of equipment-specific energy monitoring at their Eagle House development in Shoreditch, London
Energy Monitoring at Metafin to Drive Energy Reduction Strategy
Metafin , a powder coating technology business based in the Midlands requested Argand Solutions to provide a full energy monitoring solution to enable them to access data for both their electrical use and their gas consumption - allowing them to better predict costs at the business
Optimised Co-Located Grid Connection for Wind & Solar PV
Argand Solutions enables an optimised grid connection for Clean Earth Energy. Argand Solutions provided Clean Earth Energy (CE) with a GridGEM export limitation solution to enable CE to get an optimised grid connection. Through the combination of wind & solar PV, the GridGEM ensured that the combined system would never exceed the agreed export limit for the site.