Back to All Events

G99 Solar plus SWANS ANM Scheme

  • Fuse Energy Southampton, England, SO31 United Kingdom (map)

Client Problem

Netley, with "Fuse Energy" as the Argand Client, was facing significant challenges related to Compliance & Regulation and Market Interface, both of which were identified as high-level problems. The absence of Flexibility further compounded these issues, indicating a need for a robust solution to navigate regulatory landscapes and market demands effectively.

Argand’s Solution

Argand provided a comprehensive solution for Netley, centered around a Solar PV asset type. The solution included a Power Plant Controller and G100 Export Limitation, designed to manage and control power generation and export. The project involved a substantial Size of Controlled Generation / Storage of 2,400, located in Hampshire.

Client Benefits

While specific benefits are not explicitly detailed as a separate section in the provided data, the implementation of Argand's solution for Netley would typically yield several key advantages:

  • Enhanced Compliance: The focus on Compliance & Regulation, coupled with the G100 Export Limitation, would ensure adherence to necessary regulatory standards.

  • Improved Market Interface: Addressing the market interface problem would lead to more efficient and effective interactions within the energy market.

  • Increased Flexibility: The solution would likely introduce greater operational flexibility, allowing Netley to adapt to changing market conditions and demands.

  • Optimized Power Management: The Power Plant Controller and G100 Export Limitation would provide advanced control over energy generation and distribution, maximizing efficiency and stability.

  • Sustainable Energy: The adoption of Solar PV would contribute to a reduced carbon footprint and promote sustainable energy practices.

Previous
Previous
1 June

GridGEM Enables Vensys Wind Turbines to Connect to UK Grid

Next
Next
3 November

JMarr G100 Export Limitation for CHP