Keele University Enables Micro Grid with Argand G100 Solution
Oct
21

Keele University Enables Micro Grid with Argand G100 Solution

Keele University, a large educational establishment based north of Birmingham, has developed a Micro Grid for their campus (called SEND) that they are using to better balance the generation of wind & solar with their demand via energy storage. Installing wind, solar & energy storage meant that they needed to implement a G100 solution as the total generation / storage power were greater than their allowable export limit.

View Event →
G99 Solar plus SWANS ANM Scheme
Oct
21

G99 Solar plus SWANS ANM Scheme

The "Netley Solar G99 & SWANS" project, located in Hampshire, involves a 2,400 kWac Solar PV asset for Fuse Energy. It addresses key client challenges such as compliance and market interface requirements by implementing our Power Plant Controller and G100 Export Limitation solutions. As such, the project utilises Argand's GridGEM and GridLENZ products, offering client benefits including project connection enablement, real-time data access, and regulatory compliance.

View Event →
Ethical Power Type C G99 Control & EMS Interface
Apr
1
to 4 Jun

Ethical Power Type C G99 Control & EMS Interface

GridGEM was chosen by Ethical Power to provide the G99 interface for active control plus the provision of a G99 fault and power quality recorder. The system is one of only 2 that are approved in the UK market and will enable any type C or larger installation meet the existing DNO G99 requirements for real-time data recording.

View Event →
Marjon University Complex G100 Solar PV Project
Mar
1
to 3 Nov

Marjon University Complex G100 Solar PV Project

GridGEM was chosen by Plymouth Marjon University and their key energy contractor, Mole Energy, to provide a G100 compliant solution to manage their export constraint at their site. The project was deemed to be complex due to the distances involved and the client’s HV connected site which required significant design engineering. The system manages 2 different installations to ensure that export remains within the DNO’s required limit.

View Event →
GridGEM Enables “Parallel Supply” Private Wire Connection with ANM & G100
Oct
1

GridGEM Enables “Parallel Supply” Private Wire Connection with ANM & G100

GridGEM was chosen by Black Dog Biogas to provide the solution to the complex set of problems associated with connecting their biogas electricity generating units to the Vestas wind turbine manufacturing site in the Isle of Wight in the UK.

The project had issues of parallel supply, active network management (ANM) & export limitation (G100 in the UK.)

View Event →
GridGEM Enables Investor Owned Wind Turbine to Connect to Industrial Site via Private Wire
Jan
1

GridGEM Enables Investor Owned Wind Turbine to Connect to Industrial Site via Private Wire

GridGEM was chosen as the control solution to enable a 500kW wind turbine to supply electricity to Imerys’s clay mining site via a private wire in Cornwall. The project was complex due to a combination of export constraints across multiple HV connection points & the need for a dynamic changeover between different connection points.

View Event →
GridGEM Enables Southend Airport to Install 2.5MW of Solar PV
Jan
1

GridGEM Enables Southend Airport to Install 2.5MW of Solar PV

GridGEM was chosen by Syzygy Renewables as the control solution to enable a 2.5MW solar PV system to be installed at Southend Airport. The project was complex due to a combination of export constraints across multiple HV connection points & the need to solve the problem of communicating with the inverters across a runway!

View Event →
UK – 6MWp Solar PV Site Monitoring Solution
Jan
1

UK – 6MWp Solar PV Site Monitoring Solution

Prior to engaging Argand Solutions, the client, Bee Green Solar, had previously installed a 6MWp ground mount solar PV site in south west England. The site had been installed without suitable monitoring & / or performance analytics and, as such, there was no visibility on weather-adjusted returns and / or real-time O&M issues. The client engaged Argand to solve this problem.

View Event →
Optimised Co-Located Grid Connection for Wind & Solar PV
Jan
1

Optimised Co-Located Grid Connection for Wind & Solar PV

Argand Solutions enables an optimised grid connection for Clean Earth Energy. Argand Solutions provided Clean Earth Energy (CE) with a GridGEM export limitation solution to enable CE to get an optimised grid connection.  Through the combination of wind & solar PV, the GridGEM ensured that the combined system would never exceed the agreed export limit for the site.